1040.01     CONNECTIONS TO AVAILABLE SEWERS REQUIRED

All buildings within the Township of Lawrence Park erected on property abutting the sanitary sewer system of the Township shall be connected to said sanitary sewer system.

1040.02     SEWAGE DISPOSAL WHERE SEWERS UNAVAILABLE

All buildings erected upon properties not abutting the sanitary sewer system shall accommodate sanitary sewage in such manner as may be approved by the Erie County Department of Health or by such other body having jurisdiction.

1040.03     STORM DRAINAGE

All storm drainage shall be deposited into the storm sewer system or shall be accommodated in such other manner as may receive the approval of the Township Engineer, who shall specify that any proposed private storm sewer system shall not deposit storm drainage into the sanitary sewer system.

1040.04     ALTERATION OF NONCONFORMING STORM DRAINAGE SYSTEMS

All private storm sewer systems, which presently deposit storm drainage into the sanitary sewer system, shall be altered by the property owner within a period of twelve months from the effective date of this section so as to come within the requirements of Section 1040.03.

1040.99     PENALTY

Any person who shall violate any provision of this chapter shall, upon conviction thereof before a Justice of the Peace, pay to the Township of Lawrence Park a penalty not exceeding three hundred dollars ($300.00) for each violation.  The Township may collect such penalty by suit brought in the name of the Township before any Justice of the Peace in like manner as debts of like amount may be sued for under existing laws.